egeplast UK has successfully supplied high-performance pipe for Phase Two of South West Water’s Maer Lane project – an essential infrastructure upgrade aimed at reducing flood risk on The Maer, expanding treatment capacity at the Maer Lane Wastewater Treatment Works and minimising storm overflow discharges.
As part of this critical phase, egeplast UK delivered black pipe to replace the ageing ductile iron main and significantly boost the system’s capacity. A long-standing partner on South West Water’s framework, egeplast UK was appointed by principal contractor Network Plus thanks to its proven track record of over ten years and its ability to meet demanding delivery schedules with precision and reliability.
To ensure the project remained on track, egeplast UK coordinated the direct transport of the pipe from its production facility, streamlining logistics and reducing lead times to meet the tight delivery window.
egeplast’s pipe range is engineered for versatility and durability, and is available in various configurations including outer protective layers and dimensionally integrated designs.
Depending on the raw materials used, the pipe is suitable for both traditional open trench installations and advanced trenchless techniques such as horizontal directional drilling (HDD), slip-lining, ploughing, and milling.
For more information, contact egeplast UK on 01427 875770 or email sales@egeplast.uk.

